Abstract
Mosul Dam is the second biggest dam in the Middle East due to the capacity of its reservoir. Since the operation of this dam in 1986, it is suffering from seepage problems in the foundation of the dam due to the dissolution of gypsum and anhydrite layers under the foundation. This phenomenon has raised concern about the safety of the dam. Studies done during the recent years showed that grouting works can only be considered as a temporary solution at its best. It is clear now that while grouting must be continued search for long term solution must be sought if dam failure consequences are to be avoided. This must be done as soon as possible as the dam is showing more and more signs of weakness. It is further considered that the suggestions and recommendations forwarded by the team of Lulea University of Technology and the Panel of Experts in the Stockholm Workshop 24-25 May, 2016 give the most practical and suitable solutions for this problem.